DPR Under Development Points
New Features Pending to Implement
- Queue Reports
- Schedular
DPR
- LoginDisplay, Postlogin changes for local db
- appsetting changes for connection
- than reverse merge
Branch Changes
- Linked custom validation uncomment & comment dialogbox from prdnmodify –Sir will discuss
- In subtrn comparison import also need to consider JobWork
- In Prodcution controller GetLinkedBalanceQty balance need to be changes as per new logic of PrdnBatch
- As per PrdnBatch (New Table) a new report should be added
- For Production main and line delete deleteerrorcode can be implemented. Also if conditions in delete needs to be refactored.
- Only batch prdntrnid is not allowed both, because of this we no need need to prevent delete , delete1, modify of production for prdn batch already with prdn link to plan will be handle it
Transfer Plan
- When no plan, jobwork & then test yeardocno, NULL is handle or not
- In Invoice Finalize scan scrap item Errorcode C is not checked for J Trnid’s.
Total Slits branch changes
- expand width of dialog box of tranfer plan import
- Prdnplan1details analyze duplicate declare properties & remove it
- Prdnplan1details just check once delete counts methods
- In JobWork Inchallan Import for total slits error msg 1 to 999999 however 0 is also allowed
- Production Summary report query insert first in temp than do the select group by
Unit changes
- In plan Import transfer plan errorcode A with party need to check unitcode also
Round off Changes
- from itemwise pending order, machine report also needs to exclude round off